1.4 Management network cabling checklist

This page is designed to be a guide on how all nodes in a Shasta system are wired to the management network.

Steps

  • Open the SHCD

  • Go to the Device Diagrams Tab.

    • There you will see what type of hardware is on the system.
    • Take note of the hardware.
  • go to the 25G_10G or 40G_10G tab, this will depend on the SHCD.

    • we will be looking at this part of the page. SHCD
    • Based on the vendor of the nodes and the name in the first column we can determine how it is supposed to be cabled.
    • We can use mn01 as an example, this is a gigabyte master node, we noted the vendor in the device diagrams tab.
    • Once you have those two pieces of information you can open the MGMT-NET-CABLING page.
    • Locate NCN Gigabyte Master and make sure that it is cabled correctly.
  • Complete the previous steps for all nodes listed on the SHCD.

    • UANs
    • NCNs Workers
    • NCNs Masters
    • NCNs Storage
    • Application nodes

Checklist

Hardware Type Step Complete?
UAN/Application Node
Open the SHCD from the system
Go to the Device Diagrams tab, take note of the type of hardware on the system
Depending on the hardware, open either the 25G_10G tab or the 40G_10G tab.
Locate the nodes named mn
Based on the vendor of the node and the name in the first column we can determine how it is supposed to be cabled.
Check cabling against the MGMT-NET-CABLING page.
If it is cabled correctly you are done.
If it is cabled incorrectly, contact the team in charge of cabling and request a change.
NCN-Master
Open the SHCD from the system
Go to the Device Diagrams tab, take note of the type of hardware on the system
Depending on the hardware, open either the 25G_10G tab or the 40G_10G tab.
Locate the nodes named mn0x
Based on the vendor of the node and the name in the first column we can determine how it is supposed to be cabled.
Check cabling against the MGMT-NET-CABLING page.
If it is cabled correctly you are done.
If it is cabled incorrectly, contact the team in charge of cabling and request a change.
NCN-Worker
Open the SHCD from the system
Go to the Device Diagrams tab, take note of the type of hardware on the system
Depending on the hardware, open either the 25G_10G tab or the 40G_10G tab.
Locate the nodes named wn0x
Based on the vendor of the node and the name in the first column we can determine how it is supposed to be cabled.
Check cabling against the MGMT-NET-CABLING page.
If it is cabled correctly you are done.
If it is cabled incorrectly, contact the team in charge of cabling and request a change.
NCN-Storage
Open the SHCD from the system
Go to the Device Diagrams tab, take note of the type of hardware on the system
Depending on the hardware, open either the 25G_10G tab or the 40G_10G tab.
Locate the nodes named sn0x
Based on the vendor of the node and the name in the first column we can determine how it is supposed to be cabled.
Check cabling against the MGMT-NET-CABLING page.
If it is cabled correctly you are done.
If it is cabled incorrectly, contact the team in charge of cabling and request a change.