Add Additional Liquid-Cooled Cabinets to a System

This top level procedure outlines the process for adding additional liquid-cooled cabinets to a currently installed system.

Prerequisites

Procedure

  1. Perform procedures in Add Liquid-Cooled Cabinets to SLS.

  2. Reconfigure management network:

    1. Obtain updated switch configurations from CSM R&D.
    2. Verify/Update current configuration on management network switches.
    3. Verify new switches are at factory defaults.
    4. Upgrade new switch firmware.
    5. Load switch configurations onto new switches.
    6. Rack and cable new switches.
    7. Power on new switches.
  3. Perform procedures in Updating Cabinet Routes on Management NCNs.

  4. Verify new hardware has been discovered by performing the Hardware State Manager Discovery Validation procedure. After the management network has been reconfigured, it may take up to 10 minutes for the hardware in the new cabinets to become discovered.

  5. Perform procedures in Update Firmware with FAS to validate BIOS and BMC firmware levels in the new nodes, and perform updates as needed with FAS.

    Slingshot Switches are updated with procedures from the Slingshot Operations Guide.

  6. Continue on to the Slingshot Operations Guide to bring up the additional cabinets.