NOTE
CRUS was deprecated in CSM 1.2.0 and it will be removed in CSM 1.5.0. See the following links for more information:
The Compute Rolling Upgrade Service (CRUS) upgrades sets of compute nodes without requiring an entire set of nodes to be out of service at once. CRUS manages the workload management status of nodes, handling each of the following steps required to upgrade compute nodes:
CRUS enables administrators to limit the impact on production caused from upgrading compute nodes by working through one step of the upgrade process at a time. The nodes in each step are first taken out of service in the workload manager to prevent work from being scheduled. They are then upgraded, rebooted, and put back into service in the workload manager.
CRUS is built upon a few basic features of the system: